You are here:home >> products >> High-Voltage-Series >> XGN2-12 box fixed metal-enclosed switchgear
  • High-Voltage-Series

XGN2-12 box fixed metal-enclosed switchgear

Oroduct Overview

ZHE JIANG BOGUANG ELECTRICAL TECHNOLOGY CO.,LTD. has been committed to product quality control and enterprise management "manufacturing high-quality goods, integrity service" is always our commitment to the customer. The company produces crystal sales of customers is the main power supply bureau, the company (hereafter called sacsc), mechanical and electrical equipment company, best-selling domestic provinces and cities autonomous regions, many times by the national key factory, export Europe and Africa southeast Asia etc, in use process to get the user high praise!

Product Overview

XGN2-12 box-type fixed metal-enclosed switchgear (referred to as switch cabinet) for a three-phase AC 50Hz system 3.6,7.2,12KV as acceptance and distribution of electric energy, suitable for frequent operation occasions, the bus system as a single bus (can derive a single bus with bypass and dual bus architecture). The switchgear line with national standards GB3906-91 "3 ~ 35KV AC metal-enclosed switchgear" and GB standard IEC298 requirements, and there are two proposed "Five Anti" lockout feature.

The switchgear main switch ZN28-12 series of vacuum circuit breakers, equipped with CDI7 series electromagnetic actuator or CT19 Series spring actuator, rotary isolation switch with GN30-12 GN22-12 isolation switch or high-current isolation switch series products.

Use of the environment

◆ The ambient temperature limit + 40 ℃; lower limit of -5 ℃;

◆ altitude less than 1000m;

◆ mean daily relative humidity less than 95%, on average less than 90%;

◆ earthquake intensity does not exceed 8 degrees;

◆ no fire, explosion, serious pollution, chemical corrosion and severe vibration place.

◆ environmental conditions beyond the above, the user should consult with the manufacturer.

Model and meaning

Performance Parameters

◆ switchgear technical data in Table 1;

◆ Technical Data breaker and operating mechanism in Table 2, the vacuum breaker switchgear based.

◆ grounding switch technical data, technical parameters of the ground should be able to switch to the corresponding parameters with isolation switch, grounding switch so dynamic and thermal current, the contact pressure with the corresponding separated off from the same, but the distance between Earth switch fracture does not less than 125mm.

XGN2-12外形安裝圖

◆ switchgear installation dimensions see chart

◆ Structure

The metal-enclosed switchgear for the box-type structure, the cabinet frame from angle iron welded cabinet is divided into circuit breaker room, bus room, cable room and relay room. Separated by a steel plate between the chamber and the chamber.

Circuit breaker compartment in the lower cabinet, drive circuit breakers connected by rod and actuator; under current transformer and circuit breaker terminal connected to the current transformer isolation switch with terminal connection on the terminal and the circuit breaker isolation switch terminals want to connect the circuit breaker compartment also features a pressure release channel, if an internal arc occurs, the gas can be released through the exhaust passage pressure.

After the bus room in the upper cabinet, the cabinet in order to reduce the height of the bus was a product shaped arrangement, with porcelain insulators support flexural strength of 7350N, the bus and the end of the isolation switch wiring connections.

Cable compartment in the lower part of the rear of the cabinet, cable indoor support insulators can be provided with monitoring devices, cables fixed to the bracket. For the wiring of contact solution is that the room was to contact the cable room.

Breaker operating mechanism being installed in the lower left position, the top of the isolation switch operation and interlock mechanism.

Switchgear for double-sided maintenance, relay room in front of the secondary component overhaul, maintenance actuator, maintenance on the bus and the cable terminal mechanical interlock and transmission parts, repair circuit breakers, back in the breaker room and cable room are equipped with lighting.

Underneath the front of the cabinet is provided with a width direction parallel to the ground copper bus bar, its cross-section 4 * 40mm2 mechanical interlock: In order to prevent the division with a load isolation switch; prevent misclassification error breaker; prevent straying a little space; prevent grounding switch live together; prevent closing with ground knife. Switchgear with the corresponding mechanical interlock, mechanical interlock operation principle is as follows:

◆ power operation (Run → overhaul)

Switchgear in the working position, namely the upper and lower isolation switch, circuit breaker is closed, the front and back doors locked shut, and is charged to run into, when the small handle in the working position.

First off the circuit breaker, and then pull the small handle to "breaking lock" position, then the circuit breaker can not switch on, the operating handle into the hole under quarantine operation, from the pull-down, and then push up the grounding switch is closing position, then can pull the small handle to "overhaul" position, the first to open the front door, take out the back door if the back door open, power operation is completed, maintenance personnel can breaker room and cable room for maintenance and repair.

◆ power transmission operations (maintenance → Run)

Ruoyi overhaul is completed, you need to send power, its operating procedures are as follows:

The back door locked shut, shut the front door after removing the key, pull the small handle from the service position to "divide lock" position, when the front door is locked and can not switch on the circuit breaker, grounding switch operation hole insert with operating handle, from on the drop-down, the grounding switch is in the OFF position, the operating handle winning, and then insert the isolation operation hole, pushed up from the bottom, so that isolation in the closing position, remove the operating handle, pull the small handle to work position, then you can switch on the circuit breaker.

Installation, adjustment and maintenance

◆ Installation

◆ power vacuum circuit breaker in the closing minutes when produced, up, down about 7840N, this data provides the basis for estimation of stress during design basis.

◆ foundation

Referring to Figure 2 basis switchgear careful design and construction, the foundation should be flat.

◆ Setup and Notes

a. The switchgear according to the arrangement is placed on the basis of a set of adjusting straightness good switchgear, vertical, horizontal degrees and with M12 bolts or by welding methods switchgear fastened on the basis of the slot

Steel on

. b with M12 × 30 bolts link between the cabinet;

. c install the main bus, bus room to open the top cover plate installed after a good tight jacking plate, connecting busbar contact surfaces;

d install a cable to connect to the bus contact surface should be smooth, the contact surface coated with petroleum jelly after neutral, and tighten the application partition after the cable compartment cable construction and the cable trench packer.;

. e indirectly connected cabinet bus, so arranged along the direction of fused switchgear, and protective earth grounding checks whether there are any omissions, whether continuous conduction ground loops, grounding resistance should be less than 1000μΩ;

f. install secondary circuit cable, the cable from the left side of the body at the end penetration, along the side wall into the relay room, divided to the corresponding terminal block, the construction should pay attention to the cable numbers, terminal numbers do not leak or wear Chuancuo, two second cable construction finished, do not forget the cover note cable holes.

◆ acceptance test and put into operation before the preparatory work

◆ Acceptance Test Project

. a model based on electrical components installed inside check ordering information, specifications are consistent;

. b check for loose fasteners, found loose and should be tightened;

. c Check the bus connection, the contact is tight and, if exposed, should be repaired;

. d manual isolation switches, circuit breakers, and other mechanical interlock program 3-5 times, no stuck phenomenon should be flexible, and accurate action, the program is correct;

. e Check the circuit breaker, the mechanical properties of the isolation switch, meets the requirements of its own provisions;

. f Check the secondary wiring meets the requirements of the drawings, the main circuit is not energized in the case of the secondary circuit is energized action test, compliance with the requirements of secondary wiring diagrams;

g. secondary circuit dielectric strength test between the conductor and the outer casing, applying AC 50HZ, voltage 2000V, which lasted 1min, there should be no breakdown discharge phenomenon, the secondary circuit in the electronics portion of the test voltage production plant with a user agreed ;

h. the main circuit power frequency voltage insulation test, in accordance with the relative and alternate rated voltage switchgear, according to GB311. 85% of the specified value for 1min should be no breakdown flashover.

◆ operational preparations

. a need oiling activities at the site should note lubricants;

. b connected to control, signaling, lighting and other power;

. c in isolating switches, circuit breakers, etc. while in sub-gate status, which means that motivated breaker cabinet;

. d voltage switchgear transformer isolation closed, check the voltmeter is correct, if the right to go ahead;

. e Close the arrester, isolation transformers and related auxiliary appliances make operational the station;

f. Close the feeder circuit breaker of turn, check the meter is correct.

◆ maintenance and repair

After ◆ ◆ switchgear into operation, monitoring and maintenance work as follows;

. a cleaning various parts of the dust, especially dust insulating surface;

. b overhaul program locks and mechanical connection pins, remain flexible and reliable operation, the program is correct;

. c by circuit breakers, disconnectors, operating mechanism and other electrical requirements for maintenance and debugging;

. d check the electrical contact area, contact situation is good, detect ground loops, maintain continuous conduction;

e. fastening each screw, pin.

Run ◆ product acceptance and custody

◆ product can be carried out by the factory packaging and shipping after inspection, packaging, product bolted to the bottom row, during transport, except for upright not upside down, tipping, rolling, fell.

◆ by product packing list, on the whole, accessories for acceptance.

◆ before installing warehouse storage products, should prevent rain, parts. Shall be deposited in the Treasury of the original packaging, not damp; not disassemble electrical components and parts.

Random files

◆ random files include;

◆ product certification;

◆ installation manual;

◆ second construction wiring diagram;

◆ packing list.

Wearing parts, accessories and spare parts

◆ proper circuit breakers and other electrical consumables;

◆ switchgear wearing parts, in consultation with the manufacturer determined by the user;

◆ switchgear accessories, spare parts for the type of table, use can be ordered from the manufacturer.

The main circuit combination regimen example

Ordering Information

Users must provide the following information when ordering;

◆ main circuit number and a system diagram, Pareto chart;

◆ secondary circuit wiring diagram, terminal layout map, such as when the terminal is no arrangement diagram specified by the manufacturer;

Model ◆ electrical switchgear components, specifications, quantity;

◆ main bus, bus support materials, specifications otherwise specified by the manufacturer supply;

◆ switchgear using special environmental conditions, should be made when ordering;

◆ need accessories, spares, should submit its type and quantity.


Copyright 2015 http://www.7hhp.cn All Rights Reserved Technical support:Midian

国产日产精品一区二区三区四区| 印度午夜性春猛xxx交| 国产激情精品一区二区三区| 日本www高清视频| 黄色精品免费看| 日韩一本精品| 久草一本av| 99热这里只有精品1| 九七伦理97伦理| 蜜桃视频在线观看网站| 国产丝袜在线观看视频| 国产亚洲字幕| 国产一区二区久久| 精品国精品国产尤物美女| 国产区一区二区| 欧美自拍偷拍网| 国产精品怡红院| 国产成人亚洲精品播放器下载| 日本加勒比高清在线| 久久九九精品视频| 久久综合狠狠综合久久激情 | 亚洲专区在线视频| 国产免费一区二区三区最新6| 强开小嫩苞一区二区三区视频| 邪态动恶图27期gif| 日韩国产福利| 日韩一级特黄| 好吊视频一区二区三区四区| av在线不卡电影| 亚洲欧洲一区二区三区在线观看| 亚洲一区二区三区午夜| 免费不卡的av| 欧美野外多人交3| 青青草在线播放| 国产精品久久天天影视| 日韩欧美中文在线| **亚洲第一综合导航网站| 香蕉网在线播放| 国产免费视频一区二区三区| 毛片在线播放a| 国内黄色精品| av在线综合网| 欧美大片网站在线观看| 日韩中文一区| 久久精品国产成人av| 国产黄在线看| 综合久久中文字幕| 色嗨嗨av一区二区三区| 一区二区三区网| 国产麻豆日韩| 男人天堂久久久| 97超碰人人爱| 欧美激情综合五月色丁香小说| 好紧好硬好湿我太爽了| 精品国产一区三区| 久热在线观看视频| 久久成人人人人精品欧| 四虎精品一区二区永久在线观看| 91影院在线免费观看视频| 裸体裸乳免费看| 99在线精品视频免费观看20| 手机av在线| 91在线丨porny丨国产| 992tv成人免费影院| 97人妻精品一区二区免费| 交换国产精品视频一区| 国产精品一二| 久久精品国产亚洲精品| 丰满岳乱妇一区二区| 97中文字幕| 日本韩国在线视频爽| 视频国产一区| 国产精品入口麻豆九色| 国产区亚洲区欧美区| 九九热视频精品| 成人亚洲成人影院| 午夜国产欧美理论在线播放| 日韩精品在线免费观看视频| 天天综合网久久| 操人视频在线播放| av成人在线看| 成人性生交大片免费看中文| 日韩免费不卡av| 国产又黄又爽又无遮挡| wwwcom羞羞网站| 久久久久久网| 国模gogo一区二区大胆私拍 | 国产免费一区二区三区| 久久久久久亚洲av无码专区| 色成人免费网站| 欧美日韩国产在线看| 精品久久久久久无码中文野结衣| 亚洲天堂日韩av| 国产福利图片| 蜜桃91丨九色丨蝌蚪91桃色| 亚洲国产成人精品电影| 最新精品视频| 欧洲vodafonewi精品| 91精品国产91久久久久久密臀| 亚洲天堂第二页| 无码人妻精品一区二区中文| 色多多视频在线观看| 久久久九九九九| 97精品一区二区三区| 久久久夜色精品| 九色视频成人自拍| 亚洲伦伦在线| 91高潮精品免费porn| 日本中文字幕在线| 日韩精品一级毛片在线播放| 欧美精品一卡二卡| 亚洲乱码一区二区三区| 久久久久99精品成人片我成大片| 日韩免费小视频| 在线观看区一区二| 亚洲国产成人不卡| 欧美色图888| 欧美视频福利| 2019国产精品自在线拍国产不卡| 五月天精品视频| 青草青在线视频| 国产精品123区| 国产精品果冻传媒潘| 成人免费视频国产| 欧美极品在线| 国产视频在线观看一区二区三区| 日韩欧美电影一区二区| 国产剧情麻豆剧果冻传媒视频免费| 国产精品日韩| 国产精品成人免费视频| 精品一区二区三孕妇视频| 日本视频在线播放| 精品久久久久久久久久久| 精品剧情v国产在线观看在线| 午夜成人在线视频| 天堂资源在线亚洲资源| 你懂的网站在线播放| 成人a在线观看高清电影| 678五月天丁香亚洲综合网| 久久国产精品一区二区三区| 日本熟女毛茸茸| 性欧美高清come| 本田岬高潮一区二区三区| 国产精品区一区二区三含羞草| 男人天堂影院| 久久国产精品99国产| 亚洲xxx视频| 免费国产羞羞网站视频| 美女视频一区| 欧美电影精品一区二区| 日本综合在线观看| 亚洲精品乱码日韩| 日韩在线中文字幕| 精品一区二区视频在线观看| 国产宾馆自拍| 国产亚洲精品免费| 一区二区传媒有限公司| 原千岁中文字幕| 亚洲激情网站免费观看| 青青草原国产在线视频| www.99色.com| 国产午夜精品福利| 26uuu成人| 在线免费观看h| 婷婷中文字幕一区三区| 国产污在线观看| 电影一区电影二区| 久久精品一偷一偷国产| 成人日韩在线视频| 亚洲国产精品无码观看久久| 狠狠色伊人亚洲综合网站色| 六十路息与子猛烈交尾| 久九九久频精品短视频| 日韩av在线精品| xxxx黄色片| 狠狠干婷婷色| 久久99国产精品久久99小说| 你懂的视频在线播放| 亚洲成人激情av| 久久精品—区二区三区舞蹈| 97se亚洲| 国产成人在线一区二区| 国产精品久久久高清免费| 国产免费观看久久| www.午夜av| 理论视频在线观看| 成人欧美亚洲| 日韩无一区二区| 成年人午夜视频| blacked蜜桃精品一区| 91网免费观看| 欧美hdsex| 欧美日韩在线一区| 中文字幕伦理片| 久久久综合色| 久久av一区二区三区亚洲| 中文字幕免费在线视频| 亚洲福利视频导航| 美国黄色片视频| 欧美日韩成人影院|