KYN28-24KV armored remove AC metal-enclosed switchgear

Oroduct Overview

ZHE JIANG BOGUANG ELECTRICAL TECHNOLOGY CO.,LTD. has been committed to product quality control and enterprise management "manufacturing high-quality goods, integrity service" is always our commitment to the customer. The company produces crystal sales of customers is the main power supply bureau, the company (hereafter called sacsc), mechanical and electrical equipment company, best-selling domestic provinces and cities autonomous regions, many times by the national key factory, export Europe and Africa southeast Asia etc, in use process to get the user high praise!

Outline

KYN28-24 (ZK) (GZS1) armored withdrawable AC metal-enclosed switchgear (hereinafter referred to as "switching equipment"), for three-phase AC 50Hz power system for receiving and distributing power and circuit implementation of control, protection and monitoring.

Product meets the standards: GB3906-2006 "3.6-40.5kV AC metal-enclosed switchgear and control equipment", GB / T11022 "high-voltage switchgear and control equipment standards common technical requirements", IEC62271: 200 "52 less than the rated voltage 1kV AC metal-enclosed switchgear and control equipment ", DL / T404" indoor AC high voltage switchgear ordering technology. "

Model and meaning

Conditions of Use

◆ The ambient air temperature: maximum temperature 40 ℃, the lowest temperature -15 ℃

◆ Relative humidity: daily average of not more than 95%, the average vapor pressure not exceeding 2.2Kpa on average less than 90%, the average monthly water vapor pressure does not exceed 1.8Kpa

◆ Altitude: 1000m and below

◆ earthquake intensity: no more than 8 degrees.

◆ ambient air should not be obviously polluted corrosive or flammable gases, water vapor.

◆ no recurrent severe vibration.

◆ When environmental conditions than under normal use GB3906 provisions, negotiated by users and manufacturers;

Technical parameters

Note: The current transformer short-circuit capacity to be considered separately;

Product Structure

◆ switchgear structure (see Figure 1).

◆ Full metal armor, assembly structure, wide combination regimen.

◆ cabinet made of imported aluminum and zinc plating steel sheet by MlNGE machining, the use of advanced multi-fold process, with rivet nut, bolt connection, high precision and light weight, the degree of high-strength, parts versatility.

◆ Can be equipped VS1-24 series or import VD4 series vacuum circuit breaker, wide applicability, high reliability, maintenance-free for many years to achieve.

◆ handcart set to work, test location, each location has to locate and display device, safe and reliable.

◆ Used by all types of building blocks modulus change, to ensure that the car can be freely interchangeable with the specifications, with no specifications of the car must not enter.

◆ grounding switch installation

a. in the middle of loading (Front) after the cabinet for easy maintenance overhaul sided (Figure -1a).

b. in the rear loading (Rear) to facilitate the wall to save space area (Figure -1b).

◆ Current Transformer Installation:

a. After the cabinet room of the cable being installed.

b. Bend the bottom of a large plate lifting.

◆ cable compartment can be equipped with up to nine single-core cables.

◆ hyperbaric chambers are each relief channel, ensure personal safety.

◆ highly reliable interlock device, fully meet the "Five Anti" safety requirements.

◆ transported by special truck trolley, easy operation, and flexible.

◆ front door with observation windows, can easily observe the working status of interior components.

Dimensions (see Figure 2, Table 3)

Dimensions (see Figure 2, Table 3)

Transportation, installation and commissioning

· Transport and Storage Considerations

a, product handling, transportation allowed tipping, inverted and subjected to severe vibration, slings should be placed in boxes or switching equipment designated site;

b, to prevent rain, in order to avoid product moisture;

When c, switching equipment arrived at the scene, the consignee shall inspect the goods packaging is intact, whether the goods damaged or missing, notify the supplier if necessary to jointly inspect the scene;

d, shelving products should be smooth, not disassemble electrical components and parts.

· Switching equipment installation

a, the basic framework surface should be smooth and the floor above the 2 ~ 4mm, frame flatness and straightness tolerances of 1mm / m;

b, on the basis of the frame by one in order to adjust the position of the switch cabinet stitching, verticality of not more than 2mm. When the switch to more than 10 the number of cabinet from among the best start assembling. Switchgear and base frame base frame with bolted or welded;

c, to facilitate the installation of the main bus switching equipment installation LCL should be installed with the main bus alternately;

d, with pre-installed by grounding busbar switchgear cabinets main ground bus, grounding device will switch the main ground bus and power distribution room very connected;

After e, and secondary cable once the installation is complete, to plugging the gap around the cable glands and installed seal plates and separators.

Debugging · switchgear

a, inspection and quarantine contacts and insertion depth contact is good;

After b, switching equipment installed to conduct operational tests, manually operated circuit breakers, trolley and grounding switches and other components, and check the operation of all mechanical linkage program, the action to be accurate, no card phenomenon should be flexible;

maximum, minimum operating voltage of mechanical properties c, check the circuit breaker meets the requirements to operate in accordance with the provisions of the test, combined points should be normal;

d, the secondary loop current test to check the correctness of the protection, control and signal circuits actions;

e, the main loop resistance measurement, loop resistance of the circuit breaker should not exceed the standard specified value;

f, the main circuit between white and relatively frequency voltage withstand test, carried out according to the provisions of the transfer and acceptance;

g, the secondary circuit dielectric strength test 2000V / 1min. There should be no breakdown flashover. Secondary circuit electronics part, the test voltage agreed by the user and manufacturer.

Switching equipment maintenance and repair

Equipment / components (such as wearing parts) inspection and maintenance intervals, depending on its length running time, the frequency of operation and fault situations, such as breaking. Depending on the operating conditions and site environment, every 3 to 5 years for switching equipment to conduct an inspection and maintenance.

? Press the vacuum circuit breaker manual requirements, check the operation of the circuit breaker and operating mechanism, and make the necessary adjustments and lubrication;

? Check trolley into the car, the bus the whole process of working conditions, adjust and lubricate if necessary;

· Check the interlock device is flexible and reliable; adjust and lubricate as necessary;

? Check the dynamic and static isolation contact contact surfaces without damage, the insertion depth to meet the requirements, whether the spring pressure weakened, surface coating without abnormal oxidation and replace obsolete conductive paste on isolating contacts;

? Check the bus and the exposure of each conductive connection parts and fastening, surface heating phenomenon found to be processed;

? Check the ground loop section circumstances, such as exposure to ground contact, the main ground wire and grounding wire to get married, to ensure the continuity of its conductivity;

· Wipe the dust vacuum interrupter and insulation surface with a soft cloth. As a result of condensation resulting in partial discharge phenomena, may be coated with a thin layer of grease discharge surface as a temporary repair.

Random files

Product certification;

· Factory inspection report;

· Installation instructions;

· Secondary wiring diagram;

· Packing List

· Special tools;

· The main components of the switching device's instruction manual and other technical documents and attachments.

Ordering Information

· The main circuit of Figure number, use and single-line system diagram Rated voltage Rated current Rated short-circuit breaking current, power distribution room layout and arrangement of equipment, such as switches configuration diagram.

· Switchgear require control, measurement and protection functions and requirements and other automatic locking device.

· Switch the main electrical components inside the device model, size and quantity.

·  If required bus line counters or bridge connection between switching equipment, provides bus rated ampacity of the bridge, the bridge spans the bus, from the ground height data and other specific requirements.

· Switching equipment used when special environmental conditions, should be specified when ordering.

· Other special requirements.


Copyright 2015 http://www.7hhp.cn All Rights Reserved Technical support:Midian

久久久精彩视频| 免费成人在线视频网站| 欧日韩精品视频| 国产精品极品在线观看| 四虎精品成人a在线观看| 亚洲国产精品毛片av不卡在线| 日韩中文综合网| 国产精品亚洲专一区二区三区| 国内老司机av在线| 人妻视频一区二区三区| 中文字幕第88页| 欧美日韩精品在线| 伊人免费在线| jizz中国少妇| 噜噜噜久久亚洲精品国产品麻豆| 丝袜亚洲另类欧美重口| 91精品国产综合久久精品| 99国产精品久久| 日本aⅴ精品一区二区三区 | 久久精品日韩| 日韩精品在线观看一区| 欧美一区二区免费| 亚洲福利一二三区| 欧美丝袜激情| avtt天堂资源网| 99re国产在线| 性久久久久久久久久久久久久| 午夜精品久久久久久久99热浪潮| 粉嫩在线一区二区三区视频| 欧美人体一区二区三区| 在线观看xxxxvideo| 瑟瑟视频在线观看| 亚洲人成网站在线播放2019| 日韩乱码在线视频| 一区二区在线看| 999国产精品永久免费视频app| avtt亚洲| 邪态动恶图27期gif| 午夜激情福利电影| 无码人妻精品一区二区蜜桃百度| 欧美激情视频网站| 在线一区二区视频| 国产欧美91| 亚洲国产中文字幕在线| 国产福利成人在线| 天天超碰亚洲| 欧美性生活一级| 第一页在线观看| 国产成+人+亚洲+欧美+综合| 亚洲电影免费观看| 亚洲综合丝袜美腿| 日韩理论片av| 四虎精品在线观看| 国产露出视频在线观看| 色先锋av男人资源先锋影院| 亚洲av无码国产精品久久| 日本电影一区二区三区| 日韩免费av在线| 亚洲人成免费电影| 欧洲另类一二三四区| 18成人在线视频| 国产成人午夜精品5599 | 国产精品7m凸凹视频分类| 亚洲夜夜综合| 国产女主播在线观看| 亚洲午夜网未来影院| 亚洲系列在线观看| 林心如三级全黄裸体| 成人欧美精品一区二区| 欧美中日韩在线| 台湾成人av| 成人激情视频小说免费下载| 亚洲天堂影视av| 欧美日韩午夜剧场| 一区二区三区在线不卡| 国产精品久久久久久久午夜片| 中文字幕亚洲电影| 久久久精品tv| 国产剧情一区在线| 成人在线丰满少妇av| 亚洲ww精品| 青草综合视频| 亚洲男人在线| 日本不卡影院| 看黄网站在线| 3344国产永久在线观看视频| 成人日韩在线观看| 爱看av在线入口| 五月天丁香婷| 97一区二区三区| 日本三级一区二区| 中文字幕55页| 青青艹视频在线| 久久国产精品网| 亚洲伊人第一页| 最近中文字幕日韩精品 | 妞干网免费视频| 日本男人天堂网| 女人公敌韩国| 嫩草影院懂你的影院| 丰满少妇又爽又紧又丰满69| 制服国产精品| 久久精品国产亚洲精品| 欧美激情手机在线视频| 国产mv久久久| 六月婷婷久久| 成人免费视频91| 三级黄色片播放| 国产jizz18女人高潮| 成人涩涩小片视频日本| 中文字幕激情小说| 中文字幕人妻丝袜乱一区三区| www.亚洲天堂.com| 91小仙女jk白丝袜呻吟| 口述被爽到呻吟高潮自述| 狠狠色噜噜狠狠狠| 国产午夜在线视频| 欧美黄色网页| 国内亚洲精品| 麻豆国产精品官网| 国产精品福利av| 欧美日韩一区二区三区不卡| 91精品视频网| 国产做受高潮69| 久久综合色一本| 真人抽搐一进一出视频| 欧美丰满熟妇bbb久久久| 精品无码黑人又粗又大又长| 中文字幕+乱码+中文乱码www | 色综久久综合桃花网| 久久久久久久色| 成人性生交大片免费看视频直播 | 亚洲一区二区三区精品在线| 欧美图区在线视频| 欧美成人精品在线| 日韩欧美一级在线| 看全色黄大色黄女片18| 欧美性猛交xxxx乱大交少妇| 国产精品久久不卡| 中文字幕人妻丝袜乱一区三区| 五月天色网站| 懂色av中文在线| 黄色成人美女网站| 国产一区日韩二区欧美三区| 欧美视频免费在线| 亚洲美女福利视频网站| 亚洲综合中文字幕68页| 精品国产乱码久久久久久蜜柚| 老太脱裤让老头玩ⅹxxxx| 先锋资源在线视频| 亚洲国产日韩一区无码精品久久久| 国产福利小视频| 日本中文字幕电影| 九九色在线视频| 中日韩视频在线观看| 亚洲精品伦理在线| 色诱女教师一区二区三区| 99高清视频有精品视频| 国产原创精品在线| 国产精品一区二区黑人巨大| jiuse九色最新地址| 欧美精选视频一区二区| 欧美综合二区| 欧美综合欧美视频| 国内精品视频久久| www.四虎成人| 中文字幕在线播| 在线欧美成人| 日韩在线不卡| 亚洲欧美日韩久久精品| 久久久亚洲精选| 密臀av一区二区三区| 亚洲成人一级片| 乱人伦中文视频在线| 一级欧洲+日本+国产 | 日韩欧美成人区| 91麻豆桃色免费看| 国产人妻一区二区| 妞干网福利视频| 国产精品流白浆在线观看| 国产精品久99| 国内成人精品一区| 91网址在线观看精品| 欧洲精品久久一区二区| 四虎影视成人| 日韩精品1区2区3区| 欧美日韩大陆在线| 亚洲精美视频| 一级片免费网站| 天天在线视频色| 极品销魂美女一区二区三区| 亚洲欧美日韩在线一区| 轻点好疼好大好爽视频| 国产日产精品一区二区三区| 成人高清免费观看mv| 国产精品综合一区二区三区| 欧美劲爆第一页| 国产高潮呻吟久久| h在线视频免费观看完整版| 99久久激情|